Alamo Metal Buildings

Metal building contractors in Atascosa County, Texas

In the unincorporated part of Atascosa County, a new commercial or public building needs a county building permit, which the county Fire Marshal in Jourdanton issues after reviewing your plans. Single family dwellings are not required to have one.

More on this

No business opens until the county inspects and issues a Certificate of Compliance (Atascosa County Fire Marshal, permit process overview, checked 2026-09-13).

Sheet
County
Jurisdiction
Atascosa County, TX
Checked
2026-09-13
Sources
27 primary documents

Lot picked out? Each request goes to one independent contractor, whose call it is which jobs to accept.

Pumpjack and barbed wire fence on brush country along a caliche road in Atascosa County, Texas

Which office signs off on a metal building in Atascosa County, TX?

The county Fire Marshal, once the lot is outside every city line. The office in Jourdanton, 830-769-2029, permits a new commercial or public building and a remodel for a new type of business. You file an application with two sets of plans or one digital copy, and the permit cannot issue before the Fire Marshal reviews them. Draw to the 2024 International Fire and Building Codes, adopted with local amendments effective July 27, 2026; start inside 180 days or the permit goes invalid (Atascosa County Fire Marshal, permit process overview and 2024 code amendments, checked 2026-09-13). Only a county over 250,000, or one next to it, may adopt a county fire code.

Checked at Texas Legislature Online, Local Government Code Chapter 233, county regulation of housing and other structures, 2026-09-13.

Does the county check your TDLR registration before it issues the permit?

It does, and can refuse the application. Where Government Code Chapter 469 on architectural barriers applies, the Fire Marshal's office may refuse the permit application, and construction may not begin until the project is registered with TDLR; you supply the registration number and Form AB042 (Atascosa County Fire Marshal, permit process overview, checked 2026-09-13). No other county record here puts that check at the counter. The line is $50,000 in estimated construction cost, and statute bars a local permit application before the plans go to TDLR. The sequence is in the San Antonio and Bexar County permit sheet.

Checked at Texas Department of Licensing and Regulation, Architectural Barriers frequently asked questions, 2026-09-13.

Checked at Texas Legislature Online, Government Code Chapter 469, elimination of architectural barriers, 2026-09-13.

The ground under a slab in Atascosa County

Three different things. The largest unit, about 25 percent of the county, is Amphion-Floresville-Imogene, deep loamy soils whose named limitations are shrinking and swelling, corrosivity to uncoated steel and low soil strength. About 17 percent is Nueces-Aluf-Hitilo sand running to rapid permeability, and in the Monteola-Weigang-Campbellton unit the Weigang soils are limited by shallowness over bedrock. Caliche is a parent material here (USDA Soil Survey of Atascosa County, Texas, 1980, checked 2026-09-13). Hand the engineer the corrosivity line: anchor bolts, column bases and buried conduit sit in that soil. Clay, sand and shallow rock want three different foundations, so the soil report comes before the slab drawing.

Where the water drains, and whether this is Edwards Aquifer ground

Floodplain yes, aquifer no. The county Floodplain Protection Order appoints the Emergency Management Coordinator as Floodplain Administrator, who decides them. The order names the role rather than a person and publishes no direct number, so it routes through the county permit offices on 830-769-2748 (Atascosa County, floodplain order, checked 2026-09-13).

Atascosa is not among the San Antonio-region Edwards Aquifer counties TCEQ names, which are Bexar, Medina, Comal, Uvalde and Kinney; Bexar County carries that one. Wells are separate: the Edwards Aquifer Authority covers portions of Atascosa, and drilling into or through the Edwards takes a $25 permit application first. Stormwater runs on acreage: one acre for coverage, five for a Notice of Intent.

Checked at Texas Commission on Environmental Quality, Edwards Aquifer Protection Program, 2026-09-13.

Checked at Edwards Aquifer Authority, learn about the aquifer, 2026-09-13.

Checked at Edwards Aquifer Authority, well closure procedures and construction, 2026-09-13.

Checked at Texas Commission on Environmental Quality, construction stormwater general permit TXR150000, 2026-09-13.

Septic, power and a 911 address on a bare tract

Septic goes to county Environmental Health in Jourdanton, 830-769-2748. Every system in the county requires a design by a licensed site evaluator, a registered sanitarian holding a site evaluator license, or a licensed professional engineer, so no owner-drawn route exists. The county prices a commercial conventional system at $350 and a commercial aerobic system at $600 (Atascosa County Environmental Health and septic fee schedule, checked 2026-09-13). State rule counts any building that is not a dwelling or duplex as commercial. Karnes Electric Cooperative serves Atascosa and wants a 911 address, a filed warranty deed and notarized easements before the cost estimate, so start the address early, and which utility serves a given tract depends on the address. The order of those calls is in the septic, water and power sheet.

Checked at Texas Commission on Environmental Quality publication RG-472, on-site sewage facility rules compilation, 2026-09-13.

Checked at Karnes Electric Cooperative, apply for service, 2026-09-13.

The driveway is two permits, depending on the road

County road, county permit. Onto a state highway it is TxDOT instead: Form 1058 from the owner, and the right of way stays untouched until the permit is executed in full and TxDOT has 24 hours notice. Frontage shapes the site plan here, because the county adopted commercial driveway standards on June 25, 2018 (Atascosa County, comprehensive fee schedule and commercial driveway standards, checked 2026-09-13):

  • Commercial driveways are spaced at least 60 feet apart.

  • On major thoroughfares that spacing is 120 feet.

  • A commercial tract with 95 feet or less of frontage gets no more than one driveway.

  • The commercial driveway permit is $500 per driveway.

Checked at Texas Department of Transportation, access management manual, driveway permits, 2026-09-13.

Checked at Texas Department of Transportation, San Antonio District, 2026-09-13.

Inside Pleasanton, Jourdanton, Poteet and Lytle, the city permits

Four cities run their own departments here, on four code editions (city pages, checked 2026-09-13, linked under the permit stack below).

  • Pleasanton takes a commercial permit through its online portal with engineered plans, on the 2015 International Code Council editions, and requires a permit for an accessory structure over 200 square feet. That threshold sits in the residential part of its page, which states none for a commercial accessory building. 830-569-3867. The city has no zoning; that, the fire review fees and the sandy ground inside the limits are on the Pleasanton metal building sheet.

  • Jourdanton, the county seat, is on the 2006 International Building Code with an outside inspection company, 830-769-3589.

  • Poteet permits any structure, residential or commercial, and says commercial plan review normally runs two to four weeks where no civil engineer review is needed, 830-742-3574.

  • Lytle is on the 2021 International Building Code and requires a Fire Marshal plan review and inspection on every commercial application before a certificate of occupancy, 830-709-3692.

Hiring metal building contractors in Atascosa County, TX

Ask who carries the TDLR registration number into the Fire Marshal's office, because this is the one county here whose own document lets the office refuse the permit application until the project is registered (Atascosa County Fire Marshal, permit process overview, checked 2026-09-13). Then ask who seals the engineered foundation plan over clay, sand or caliche, and who prepares the septic planning materials.

Each request lands with one independent metal building contractor, whose call it is which jobs to accept, and no Texas builder license sits behind that title, which is set out in the San Antonio and Bexar County permit sheet. The build order is in the start-to-finish San Antonio guide, the next sheet west is Frio County and the next one east is Karnes County, and the common builds here are commercial steel buildings and metal shop buildings.

Checked at Sunset Advisory Commission, Texas Residential Construction Commission; TDLR regulated industries list, 2026-09-13.

Atascosa County, TX permits, row by row

Each permit and rule the county's own site posts for work outside city limits: who to call, the number, where it was checked and when.

Building permit outside city limits

On the county site

In the unincorporated area, Atascosa County requires a building permit ahead of any new commercial or public building, any remodel that puts a new kind of business in an existing building, and any multifamily dwelling with four units or more. Single family dwellings need none. The permit is issued by the Atascosa County Fire Marshal and Emergency Management Office at 711 Broadway, Jourdanton. The applicant submits an application plus two sets of building plans or one digital copy, the Fire Marshal cannot issue the permit before reviewing the plans, and the building permit must remain on the construction site until the project is complete.

Atascosa County Fire Marshal and Emergency Management Office, 830-769-2029.

Checked at Atascosa County Fire Marshal and Emergency Management Office, Permit and Inspection Process Overview, 2026-09-13.

Final inspection and certificate of compliance

On the county site

When the project is finished the applicant files a Request for Final Inspection with Atascosa County, and a Certificate of Compliance is issued after that inspection. The county document states a business may not open without it. The same document quotes 2024 International Building Code Section 105.5, under which a permit becomes invalid where work is not commenced within 180 days of issuance, or where work is suspended or abandoned for 180 days, with written extensions of up to 180 days each.

Atascosa County Fire Marshal and Emergency Management Office, 830-769-2029.

Checked at Atascosa County Fire Marshal and Emergency Management Office, Permit and Inspection Process Overview, 2026-09-13.

Accessibility registration before the county permit

On the county site

Where Texas Government Code Chapter 469 on the elimination of architectural barriers applies, the Atascosa County Fire Marshal's office may refuse the permit application, and construction may not begin until the project has been registered with TDLR, the state licensing department; the applicant hands over the registration number and TDLR Form AB042.

Atascosa County Fire Marshal and Emergency Management Office, 830-769-2029.

Checked at Atascosa County Fire Marshal and Emergency Management Office, Permit and Inspection Process Overview, 2026-09-13.

Adopted county codes

On the county site

Atascosa County has adopted the 2024 International Fire Code and the 2024 International Building Code, as locally amended, effective July 27, 2026, along with Appendices A, B, C, D, E, F, H, I, P, Q and R. The amendments also adopt NFPA 75, the standard for the fire protection of information technology equipment, 2023 edition, and require third-party fire protection reviews for a battery energy storage system exceeding 1 MWh and for a data center exceeding 100,000 square feet.

Atascosa County Fire Marshal's Office, 830-769-2029.

Checked at Atascosa County Fire Marshal's Office, Code Amendments for 2024 IFC and IBC, 2026-09-13.

Published county building permit fees

On the county site

The Atascosa County Fire Marshal fee schedule, effective May 2023, charges a flat $200.00 for a commercial or public access project with a total valuation of less than $6,250.00 and uses a sliding table above that. The base fee for plans review is $40.00, the county estimates commercial construction at $75.00 per square foot for valuation, final inspection and certificate of occupancy fees are $25.00, a preliminary fire protection review is $250.00, and the permit covers a minimum of three construction site visits or inspections. The schedule states that residential permits are not required by law.

Atascosa County Fire Marshal's Office, 830-769-2029.

Checked at Atascosa County Fire Marshal's Office, Fee Schedule, 2026-09-13.

On-site sewage facility permit

On the county site

On-site sewage facility permits in Atascosa County are handled by the county Environmental Health department at 1 Courthouse Circle Drive, Suite 103, Jourdanton. Every system in the county requires a design by a licensed site evaluator, a registered sanitarian holding a site evaluator license, or a licensed professional engineer. Septic inspections run Monday, Wednesday and Friday and are scheduled at least one day in advance, the applicant calls between 8:00 and 8:30 a.m. on the day of the inspection, a $75.00 re-inspection fee applies after the first inspection, and all permit fees are non-refundable and good for one year.

Atascosa County Environmental Health, 830-769-2748.

Checked at Atascosa County, Environmental Health, 2026-09-13.

Published septic fees

On the county site

The Atascosa County septic inspection fee schedule prices a commercial conventional system at $350 and a commercial aerobic system at $600, against $250 and $400 for the residential equivalents, with certification of septic at $75 and a reinspection fee of $75 per reinspection.

Atascosa County Environmental Health, 830-769-2748.

Checked at Atascosa County, Septic Inspection Fee Schedule, 2026-09-13.

Floodplain development permit

On the county site

The Atascosa County Floodplain Protection Order appoints the county Emergency Management Coordinator as the Floodplain Administrator, who receives and decides floodplain development permit applications. The order names the role rather than a person, and the county publishes no direct number for it, so a floodplain question routes through the county permit offices.

Atascosa County Floodplain Administrator, the Emergency Management Coordinator, 830-769-2748.

Checked at Atascosa County, Floodplain Protection Order, 2026-09-13.

Driveway permit and county fee schedule

On the county site

The Atascosa County Comprehensive Fee Schedule sets a commercial driveway permit at $500 per driveway against $25 for the residential equivalent, a commercial floodplain permit fee of $200 against $25 residential, commercial utility construction in county right of way at $500 per mile or part of a mile, and a minimum application fee of $700.00 for all subdivisions. The county adopted commercial driveway standards and a permitting process on June 25, 2018, which space commercial driveways a minimum of 60 feet apart, 120 feet on major thoroughfares, allow no more than one driveway on a commercial tract with 95 feet or less of frontage on a public street, and set a 300-foot sight requirement. The county states that these fees are subject to change.

Atascosa County, 830-769-3093.

Checked at Atascosa County, Comprehensive Fee Schedule and Commercial Driveway Standards and Permitting Process, 2026-09-13.

911 addressing

On the county site

The Atascosa County 911 Addressing and Rural Development office at 1 Courthouse Circle Drive, Suite 106, Jourdanton, handles 911 address requests and points subdivision applicants to the county permits page. It is staffed by an on-site sewage facility designated representative, a permit coordinator and an administrative assistant.

Atascosa County 911 Addressing and Rural Development, 830-769-2748.

Checked at Atascosa County, 911 Addressing and Rural Development, 2026-09-13.

What the county says about its own authority

On the county site

Atascosa County publishes a development guide stating that Texas law gives counties only limited regulatory authority over private development in the unincorporated area, and urging early communication with the county.

Atascosa County, 830-769-3093.

Checked at Atascosa County, Development Transparency and Community Engagement Principles, 2026-09-13.

Each row comes off Atascosa County's own site, on the date printed beside it. None is copied from a neighboring county. A blank on the county site means the county posts nothing on that item; it does not mean a building goes up unregulated. The state $50,000 registration and the acre-based stormwater rules hold no matter what the county posts, and so do the 11 rules above that Atascosa County does post, each on the terms in its own row. Cities inside the county permit for themselves, so an address inside a city limit gets confirmed at that city hall; the only cities described here are the ones whose own pages were checked.

Atascosa requires a county permit before a new commercial or public building, while Karnes County names no building official on any page checked. All seven rows, and the cities inside each that publish their own permit page, are on the seven-county permit office list.

City permit pages checked in Atascosa County

  • Pleasanton , Community Development Services , 830-569-3867 . Checked at the Pleasanton permit page, 2026-10-05.
  • Jourdanton , City of Jourdanton, 1604 SH 97 E , 830-769-3589 . Checked at the Jourdanton permit page, 2026-09-13.
  • Poteet , City Hall, 491 Avenue H , 830-742-3574 . Checked at the Poteet permit page, 2026-09-13.
  • Lytle , Building Department , 830-709-3692 . Checked at the Lytle permit page, 2026-09-13.

Soil and water records checked for Atascosa County

What owners ask

Is a building permit required for a metal building in Atascosa County, TX?

Yes for a new commercial or public building outside the cities. The Atascosa County Fire Marshal and Emergency Management Office at 711 Broadway in Jourdanton, 830-769-2029, issues it. Single family dwellings are not required to have one. You file an application with two sets of building plans or one digital copy, the Fire Marshal reviews them before the permit can issue, and a Request for Final Inspection produces the Certificate of Compliance, which the county says a business may not open without. Inside Pleasanton, Jourdanton, Poteet or Lytle the city permits the building instead. Checked at the Atascosa County Fire Marshal Permit and Inspection Process Overview, 2026-09-13.

What does an Atascosa County building permit cost?

The county Fire Marshal fee schedule, effective May 2023, charges a flat $200.00 for a commercial or public access project valued under $6,250.00 and a sliding table above that, plus $40.00 base plans review, $25.00 for final inspection and certificate of occupancy, and $250.00 for a preliminary fire protection review, covering a minimum of three site visits. The county estimates commercial construction at $75.00 per square foot when it sets valuation. Other county fees are separate: commercial floodplain $200.00, commercial driveway $500 per driveway, commercial conventional septic $350, commercial aerobic septic $600. Fees are subject to change. Checked at the Atascosa County fee schedules, 2026-09-13.

Does Atascosa County check TDLR registration before issuing a building permit?

It does. Where Texas Government Code Chapter 469 on the elimination of architectural barriers applies, the Atascosa County Fire Marshal's office may refuse the permit application, and construction may not begin until the project has been registered with TDLR, the state licensing department; the applicant hands over the registration number and TDLR Form AB042. The state line is $50,000 in total estimated construction cost, at which the project is registered and the construction documents go to a registered accessibility specialist for review. Under $50,000 a project still complies with the Texas Accessibility Standards without registering. Checked at the county permit process overview and the TDLR Architectural Barriers pages, 2026-09-13.

Which building codes does Atascosa County build to outside the cities?

Atascosa County has adopted the 2024 International Fire Code and the 2024 International Building Code, as locally amended, effective July 27, 2026, along with Appendices A, B, C, D, E, F, H, I, P, Q and R. The amendments also adopt NFPA 75, the standard for the fire protection of information technology equipment, 2023 edition, and require third-party fire protection reviews for a battery energy storage system exceeding 1 MWh and for a data center exceeding 100,000 square feet. Draw the building to those editions, and note that a permit becomes invalid where work is not commenced within 180 days of issuance. Checked at the Atascosa County Fire Marshal code amendments for the 2024 IFC and IBC and the permit and inspection process overview, 2026-09-13.

Price request, no charge

Price a building on your lot

Six boxes: who you are, how to reach you, the county, the building and the timing.

Your request reaches one independent contractor, and which jobs to accept is that contractor's call. You never pay Compass Camper LLC anything.

By submitting this form, I agree that Alamo Metal Buildings and a metal building construction contractor may contact me at the phone number and email address I provided, including by automated phone calls and prerecorded messages, regarding metal building construction services. Consent is not a condition of any purchase. Message and data rates may apply. I may opt out at any time by asking to be removed during any call or by replying to any email. See our Privacy Policy.

One independent contractor gets your request and chooses which jobs to take on; it does not go to a national lead list.

Prefer the phone? Call (830) 251-6374. Calling gets you the same estimate.

A lot in Atascosa County, TX?

One independent contractor gets your request and chooses which jobs to take on; it does not go to a national lead list.

Checked against the sources 2026-09-13.

(830) 251-6374 Request a building price