Alamo Metal Buildings

Hondo, Texas metal buildings

Hondo is the Medina County seat, and a metal shop, carport or commercial building there answers to whichever government holds the lot: inside the city limits, the City of Hondo Development Services Department at 1600 Avenue M; past them, Medina County, whose published list of required permits carries septic, floodplain and driveway but no building permit. One independent metal building contractor is sent each request from this page and makes its own call on which projects to accept.

More on this

Three city documents shape a steel building from the start: every building or accessory structure inside the limits needs a permit, both permit checklists want a sealed engineered foundation plan backed by a geotechnical survey or soil test, and a carport may come within five feet of the front property line (City of Hondo permit checklists and Ordinance 1205-07-19, checked 2026-10-12).

Sheet
Town
Jurisdiction
Hondo, Medina County, TX
Checked
2026-10-12
Sources
26 primary documents

Lot in or around Hondo? Each request goes to one independent contractor, whose call it is which jobs to accept.

Who permits a metal building in Hondo, under which codes, and what happens past the city limits?

Inside the limits, Development Services at 1600 Avenue M, 830-426-4737. Its construction permit application, revised in June 2025, goes in with the plans and the fees attached, the processing fee is not refunded, and every fee doubles if work begins before the permit issues. A permit lapses when the work has not started 180 days after issue, or sits idle for 180 days once under way, and nobody moves into the building until it passes a final inspection and gets its Certificate of Occupancy.

Hondo's code year is 2015. The Building Inspections page lists the 2015 International Building, Residential, Fire, Energy Conservation, Mechanical, Plumbing and Existing Building Codes, the 2015 Life Safety Code, the 2016 fire alarm code and the 2017 National Electrical Code, all adopted through Ordinance 1131-07-17. A designer used to newer editions should draw this building to those years.

Past the limits the picture changes twice. First comes a one-mile extraterritorial band where, by the city development guide, Hondo applies its subdivision rules; Texas law does not let a city require its own building permit out there, but where a development plat is required, no permit on the tract issues until the plat is approved. Beyond the city, Medina County names five required permits and none of them is a building permit, and its Fire Marshal page covers burn permits with no adopted fire code or commercial plan review (Medina County records, checked 2026-09-13). Read that as the county's own list, not as leave to skip septic, floodplain or driveway approval; the Medina County sheet has each office.

Checked at City of Hondo Development Services, construction permit application (revised June 2025), 2026-10-12.

Checked at City of Hondo Development Services, Building Inspections, 2026-10-12.

Checked at City of Hondo, Development Guide, Chapter 3, platting, 2026-10-12.

Checked at Texas Legislature Online, Local Government Code Chapter 212, municipal regulation of subdivisions and property development, 2026-09-13.

Checked, and the item is not there. Checked at Medina County, What Type of Permits Are Required In Medina County?, 2026-09-13.

Checked, and the item is not there. Checked at Medina County, Emergency Management and Fire Marshall, 2026-09-13.

Can a metal garage, shop or carport go behind a Hondo house, and how close to the street?

Yes, with a permit, and the checklists name no size small enough to skip one. The residential checklist opens with the rule that no building or accessory structure goes up inside the corporate limits, and no existing one is structurally altered or added to, until a building permit has issued. Even for a house lot it asks for two sets of plans, two copies of a site or plat plan drawn from a property survey, and two copies of a sealed engineered foundation plan with a geotechnical survey or soil test, plus a flood elevation certificate where one applies. The city reviews residential plans in about 10 to 15 business days.

Placement comes from the Unified Development Code as Ordinance 1205-07-19 rewrote it in July 2019. Garages, tool sheds and other utility buildings belong behind the front setback line. A carport, which the code defines as an open-sided structure with a roof on posts for parking an automobile, can sit as close as five feet to the front property line, and a detached carport keeps no set distance from the house or any other building on the lot. Attach either one to the house and it becomes part of the house, held to the house setbacks. No accessory building may be used for commercial purposes, so a shop that will run a business goes through the commercial process in the next section.

The setback for each zoning district lives in the Unified Development Code, so ask Development Services which district holds the lot before the site plan is drawn. Before any digging, the contractor stakes the property pins and outlines the building so the setbacks can be checked on the ground, and a new or widened driveway needs a city review and an inspection before the concrete or asphalt is placed. The building types are on detached garages and RV garages and metal shop buildings.

What two City of Hondo documents say about a building behind a house: the Residential Construction Permit Checklist and Ordinance 1205-07-19, passed July 22, 2019. Checked 2026-10-12.
ItemWhat the city document says
PermitNeeded to erect any building or accessory structure, or to structurally alter or add to one
FoundationSealed engineered foundation plan with a geotechnical survey or soil test, two copies
Garage, shed or utility buildingBehind the front setback line
Detached carportAt least five feet from the front property line, with no spacing rule from other buildings
Attached garage or carportCounted as part of the house and held to its setbacks
Commercial useNot allowed in an accessory building

Checked at City of Hondo, Residential Construction Permit Checklist, 2026-10-12.

Checked at City of Hondo, Ordinance 1205-07-19 (carports and accessory buildings, UDC sections 11.2 and 7.5), 2026-10-12.

Checked at City of Hondo, Development Guide, Chapter 5, residential building permits, 2026-10-12.

What goes into a Hondo permit package for a commercial steel building?

Zoning and the plat come first. The city requires every applicant to meet the Development Officer before filing anything, and its meeting agenda asks the owner to walk through building size, building materials and aesthetics, parking, drainage, landscaping, paving and delivery access. A use that needs a specific use permit or a zone change goes to a Planning and Zoning Commission hearing and then a City Council hearing, with letters to owners within 200 feet; the development guide puts a rezoning at about two months, and the fee schedule charges $500.00 for either request.

Then the checklist. The Non-Residential Permit Checklist asks for construction plans; site or plat plans showing setbacks, lot coverage, drainage, fire lanes and floodplains; a property survey with the legal description; a sealed engineered foundation plan with a geotechnical survey or soil test; an energy compliance report; a flood elevation certificate and an asbestos survey where they apply; and TDLR registration on a project over $50,000.00. Past 5,000 square feet of floor area, the mechanical, electrical and plumbing plans have to be sealed and engineered too. The general contractor or the owner files the building permit, a master electrician holding an electrical contractor license files the electrical permit, and a responsible master plumber holding a plumbing contractor license files the plumbing permit. The checklist calls for three copies of each set, while the development guide asks for two paper sets and an electronic one, so ask Development Services which count it takes now.

A third-party plan reviewer, joined by the City Engineers where needed, usually returns a complete set in 10 to 15 business days, and each resubmission starts that clock over. Every development files a drainage report, which can lead to required detention, and a site disturbing more than one acre adds a stormwater pollution prevention plan under the TCEQ general permit. The guide names a Highway 90 Corridor Overlay District and leaves its design criteria marked Reserved, so on a Highway 90 lot, ask about any overlay before the elevations are drawn. Registration is covered on TDLR registration for projects over $50,000, and the buildings on commercial steel buildings and warehouses and industrial buildings.

The fee follows the valuation, for everything except residential projects, which the city bills on a separate calculation. By this site arithmetic on the table below, a $250,000 commercial building carries a $1,833.75 construction permit fee and, at 65 percent of that, a $1,191.94 plan review fee, both normally collected when the permit issues. Fire code plan review and inspections bill at actual cost plus a five percent administrative fee, and the Fire Marshal safety inspection is $100.00.

Construction permit fee for non-residential work, City of Hondo FY 2023/2024 Comprehensive Fee Schedule (Ordinance 1277-09-23, effective October 1, 2023), the most recent schedule the city posts. Checked 2026-10-12.
Construction valuationPermit fee
$1 to $2,000$80.00
$2,001 to $25,000$80.00 for the first $2,000, plus $14.00 for each added $1,000
$25,001 to $50,000$391.25 for the first $25,000, plus $10.10 for each added $1,000
$50,001 to $100,000$643.75 for the first $50,000, plus $7.00 for each added $1,000
$100,001 to $500,000$993.75 for the first $100,000, plus $5.60 for each added $1,000
$500,001 to $1,000,000$3,233.75 for the first $500,000, plus $4.75 for each added $1,000
Over $1,000,000$5,608.75 for the first $1,000,000, plus $3.25 for each added $1,000

Checked at City of Hondo, pre-application meeting agenda, 2026-10-12.

The guide names the overlay and publishes no criteria for it. Checked at City of Hondo, Development Guide, Chapter 6, overlay design criteria, 2026-10-12.

Checked at City of Hondo, Non-Residential Permit Checklist (2020-01-16), 2026-10-12.

Checked at City of Hondo, Ordinance 1277-09-23, FY 2023/2024 Comprehensive Fee Schedule, 2026-10-12.

Checked at Texas Department of Licensing and Regulation, Architectural Barriers frequently asked questions, 2026-09-13.

What is under a slab in Hondo?

Knippa clay, under most of the town. Running the NRCS soil survey against the Census Bureau city limits, this site finds Knippa clay beneath about 62 percent of Hondo, nearly all of it the level phase, and NRCS rates it very limited for small commercial buildings because it shrinks and swells. All told, about 77 percent of the mapped ground in the limits carries that very limited rating, about six percent rates somewhat limited, and about 16 percent rates not limited, the best of it Sabenyo clay loam, Valco clay loam and two Atco loam units. Two smaller clays, Monteola and Montell, bring a second reason onto the NRCS list: the risk of the ground sinking because of gypsum, alongside shrink-swell.

About 12 percent of the city is Divot clay loam mapped as occasionally or frequently flooded, with very brief floods of four to 48 hours listed from May through September. Those are the lots where the floodplain rows further down this page decide the order of work.

Hondo builds the soil question into the permit itself: the sealed foundation plan has to rest on a geotechnical survey or soil test, on a house lot and a commercial one alike. What the slab drawing and the anchor bolts need is on the slab and foundation sheet, and the dirt work before it on the pad grading and site prep sheet.

Hondo soils by area, the biggest five mapped inside the city limits in the NRCS soil survey of Medina County (SSURGO TX325, version of September 3, 2026), each carrying its NRCS small commercial building rating. This site computed each share by overlaying the map units on the Census Bureau current Hondo boundary. Checked 2026-10-12.
Soil map unitShare of the cityNRCS ratingReason listed
Knippa clay, 0 to 1 percent slopes58.9 percentVery limitedShrink-swell
Divot clay loam, occasionally flooded10.0 percentVery limitedFlooding, shrink-swell
Sabenyo clay loam, 1 to 5 percent slopes4.7 percentNot limitedNone listed
Castroville clay loam, 0 to 1 percent slopes4.0 percentSomewhat limitedShrink-swell
Valco clay loam, 0 to 2 percent slopes3.7 percentNot limitedNone listed

Checked at USDA Natural Resources Conservation Service, soil survey of Medina County, Texas (SSURGO TX325, version of 2026-09-03), read through Soil Data Access against the Census Bureau Hondo city boundary, 2026-10-12.

Checked at City of Hondo, Non-Residential Permit Checklist (2020-01-16), 2026-10-12.

Power, water and the Edwards Aquifer for a building in Hondo

The city runs most of it. Hondo's Utility Billing Department provides water, sewer, electric and garbage service inside the city limits and in parts of the ETJ, and the electric side is a city-owned distribution system that buys its wholesale power from City Public Service of San Antonio and serves more than 3,500 customers. The development guide also lists Medina Electric Co-op as an electric provider in the area and CenterPoint Energy for gas, so pin down which electric utility holds the address before the service is designed. Medina Electric charges a non-refundable $100 engineering fee before its site visit and quotes four to six weeks once a job is sent to construction.

A commercial account opens on an application signed in front of city staff or notarized, with ID and the deed or lease; the city lists deposits of $750 for commercial electric and $200 for commercial water, each adjusted for size, and $25 a meter to connect. On the fee schedule a new commercial electric service bills at actual cost plus a 10 percent planning fee, a temporary construction loop is $250.00, and a sewer tap runs $2,350 under five feet deep or $2,950 at five feet or more. New development that ties into city water also dedicates water rights sized to its projected demand, and where a plat is required, neither a building permit nor a utility connection comes until the plat is approved and filed with the County Clerk. Call Lone Star 811 at least two working days before any digging.

City water comes from deep wells in the Edwards Aquifer, Balcones Fault Zone, by the city's 2025 drinking water report. The TCEQ protection plan is a separate question, and inside the limits the map answers it: the TCEQ zone map puts none of the three regulated zones, recharge, transition or contributing, inside Hondo, and the nearest, the recharge zone to the north, lies about 4.4 miles from the closest city edge and about 5.8 miles from the Census Bureau interior point of the city. A lot farther out can still land on it, and there TCEQ wants an approved protection plan in hand before construction starts. The Edwards Aquifer Authority, which covers all of Medina County, takes a $25 permit application before a well is drilled into the aquifer. Zones and plan fees are on the Edwards Aquifer sheet, and service lines on the septic, water and electric sheet.

Checked at City of Hondo, Utilities, 2026-10-12.

Checked at City of Hondo Public Works, Electric Division, 2026-10-12.

Checked at City of Hondo, Development Guide, Chapter 4 and appendix, 2026-10-12.

Checked at Medina Electric Cooperative, start or stop service, 2026-09-13.

Checked at City of Hondo, commercial utility service agreement (2025), 2026-10-12.

Checked at City of Hondo, Ordinance 1277-09-23, FY 2023/2024 Comprehensive Fee Schedule, new service fees, 2026-10-12.

Checked at City of Hondo, 2025 Drinking Water Quality Report, 2026-10-12.

Checked at Texas Commission on Environmental Quality, Edwards Aquifer regulated zones map service, queried against the Census Bureau TIGERweb Hondo city boundary, 2026-10-12.

Checked at Texas Commission on Environmental Quality, Edwards Aquifer Protection Program, 2026-09-13.

Checked at Edwards Aquifer Authority, learn about the aquifer, 2026-09-13.

Checked at Edwards Aquifer Authority, well closure procedures and construction, 2026-09-13.

Floodplain, septic and the driveway, in town and out

Inside the limits, a floodplain development permit and an elevation certificate go in with the building permit on any lot in a flood hazard area. The development guide is blunt about the regulatory floodplain and floodway: development there is prohibited unless a Texas-licensed engineer shows, through hydrologic and hydraulic analysis, that it would not raise flood levels anywhere in the community, and ground the city has flagged as a flood hazard can need a detailed study even where no floodplain is mapped yet. The city floodplain permit itself is $50 plus any consultant review fees.

Outside the limits, Medina County Environmental Health in Hondo, 830-741-6195, permits every septic system in the county, $200.00 conventional and $400.00 aerobic, and wants licensed individuals to design and install it; the same office takes the floodplain development permit at $45 and accepts only the 2020 FEMA maps. A driveway onto a county road goes through the Precinct Commissioner for that precinct, a lot with no public water registers a well through the Medina County Ground Water Conservation District, 830-741-3162, and a new address comes from county 911 addressing, 830-741-8997 (county records, checked 2026-09-13).

For a driveway connecting to a state highway, the permit is TxDOT Form 1058, filed with the San Antonio District at 210-615-1110, and right-of-way work waits for a fully executed permit and 24 hours of notice to TxDOT: the TxDOT and county driveway sheet.

Checked at City of Hondo, Development Guide, Chapter 5, floodplain development, 2026-10-12.

Checked at City of Hondo, Ordinance 1277-09-23, FY 2023/2024 Comprehensive Fee Schedule, 2026-10-12.

Checked at Texas Department of Transportation, access management manual, driveway permits, 2026-09-13.

Checked at Texas Department of Transportation, San Antonio District, 2026-09-13.

Checked at Medina County, What Type of Permits Are Required In Medina County?, 2026-09-13.

Checked at Medina County, Medina County Environmental Health Group, 2026-09-13.

Getting a Hondo metal building priced

Four answers move the first number more than the steel does: inside the limits or out, whether the use fits the zoning or needs a specific use permit, what the geotechnical report says about that Knippa clay, and how much of the parcel sits on mapped floodplain. A commercial quote that leaves out sealed MEP drawings on a building over 5,000 square feet, or the soil test the city asks for by name, is missing work the permit will require.

Each request from this page reaches one independent metal building contractor, who alone weighs whether to bid. No Texas agency licenses builders, a point the permit sheet for San Antonio and Bexar County covers, though Hondo's checklist still has a licensed master electrician and master plumber pull the trade permits. For a pole barn on acreage past the limits, see pole barns and post-frame buildings; the sequence from land to final inspection is laid out in the start-to-finish San Antonio guide.

Checked at Sunset Advisory Commission, Texas Residential Construction Commission; TDLR regulated industries list, 2026-09-13.

Checked at City of Hondo, Non-Residential Permit Checklist (2020-01-16), 2026-10-12.

Hondo, TX permits, row by row

Each office a building on a lot in or around Hondo meets, city rows first, then the Medina County rows for a lot past the city limits, each with the document it was checked at and the date.

Pre-application meeting and zoning

Inside the city

Every applicant meets the Development Officer before filing. A specific use permit or zone change goes to the Planning and Zoning Commission, then City Council, at $500.00 each.

City of Hondo Development Services, Development Officer, 830-426-4737.

Checked at City of Hondo, pre-application meeting agenda, 2026-10-12 and City of Hondo, Development Guide, Chapter 2, zoning, 2026-10-12 and City of Hondo, Ordinance 1277-09-23, FY 2023/2024 Comprehensive Fee Schedule, 2026-10-12.

Building permit

Inside the city

Filed with plans and fees; fees double if work starts first; void if work has not begun 180 days after issue; Certificate of Occupancy before use. 2015 International codes.

City of Hondo Development Services Department, 830-426-4737.

Checked at City of Hondo Development Services, construction permit application (revised June 2025), 2026-10-12 and City of Hondo Development Services, Building Inspections, 2026-10-12.

Plans and foundation

Inside the city

A sealed engineered foundation plan with a geotechnical survey or soil test on house and commercial lots; sealed MEP plans over 5,000 square feet; TDLR registration over $50,000.

City of Hondo Development Services Department, 830-426-4737.

Checked at City of Hondo, Non-Residential Permit Checklist (2020-01-16), 2026-10-12 and City of Hondo, Residential Construction Permit Checklist, 2026-10-12.

Plat and water rights

Inside the city

Where a plat is required, no building permit or utility connection until it is filed with the County Clerk. New development on city water dedicates water rights.

City of Hondo Development Officer, 830-426-4737.

Checked at City of Hondo, Development Guide, Chapter 3, platting, 2026-10-12.

Floodplain development permit

Inside the city

Filed with the building permit, with an elevation certificate. No development in the regulatory floodplain or floodway without an engineer showing no rise. $50 plus consultant fees.

City of Hondo Development Services Department, 830-426-4737.

Checked at City of Hondo, Development Guide, Chapter 5, floodplain development, 2026-10-12 and City of Hondo, Ordinance 1277-09-23, FY 2023/2024 Comprehensive Fee Schedule, 2026-10-12.

Water, sewer and electric

Inside the city

City-run inside the limits and in parts of the ETJ. Commercial deposits $750 electric and $200 water, sized; $25 a meter to connect.

City of Hondo Utility Billing, 830-426-3378.

Checked at City of Hondo, Utilities, 2026-10-12 and City of Hondo, commercial utility service agreement (2025), 2026-10-12.

County building permit and fire code

Outside the city

Neither appears on what the county publishes. Confirm with the county before relying on that.

Medina County, 1100 16th Street, Hondo, 830-741-6000.

Checked at Medina County, What Type of Permits Are Required In Medina County?, 2026-09-13 and Medina County, Emergency Management and Fire Marshall, 2026-09-13.

Septic and floodplain

Outside the city

All septic systems need a county permit: $200 for conventional, $400 for aerobic. Floodplain work is $45 and uses only the 2020 FEMA maps.

Medina County Environmental Health Department, 830-741-6195.

Checked at Medina County, What Type of Permits Are Required In Medina County?, 2026-09-13 and Medina County, Medina County Environmental Health Group, 2026-09-13.

Driveway onto a county road

Outside the city

Ask the Precinct Commissioner whose precinct holds the lot; the county keeps no central driveway office.

Medina County Precinct Commissioner, 830-741-6016, 830-931-4000, 830-741-6006, 830-665-8015.

Checked at Medina County, What Type of Permits Are Required In Medina County?, 2026-09-13.

Water well

Outside the city

A lot with no public or community water registers its well with the groundwater district, a separate agency from the county.

Medina County Ground Water Conservation District, 830-741-3162.

Checked at Medina County, What Type of Permits Are Required In Medina County?, 2026-09-13.

Driveway onto a state highway

Outside the city

Form 1058 to the TxDOT district; right-of-way work waits for the fully executed permit and 24 hours of notice.

TxDOT San Antonio District, 210-615-1110.

Checked at Texas Department of Transportation, access management manual, driveway permits, 2026-09-13 and Texas Department of Transportation, San Antonio District, 2026-09-13.

A row says only what its document says, on the date beside it. Every county row, with the ones this page leaves out, is on the Medina County, TX sheet.

What Hondo owners ask

Does a metal building inside Hondo, TX need a city permit?

Inside the city limits, yes. Both Hondo permit checklists state that no building or accessory structure may be erected or constructed inside the corporate limits, and no existing one structurally altered or added to, without a building permit, and both ask for a sealed engineered foundation plan with a geotechnical survey or soil test. Starting work before the permit doubles every fee. Outside the limits, the Medina County list of required permits does not include a building permit, though septic, floodplain and driveway permits still apply (Medina County permit list, checked 2026-09-13). Checked at the City of Hondo permit checklists and construction permit application, 2026-10-12.

How close to the street can a carport sit on a Hondo lot?

As close as five feet to the front property line. Ordinance 1205-07-19, passed July 22, 2019, amended the Unified Development Code so that garages, tool sheds and other utility buildings stay behind the front setback line, while a carport may sit at a minimum of five feet from the front property line, with no spacing required between a detached carport and any other structure. A carport or accessory building attached to the house counts as part of the house and meets the house setbacks, and no accessory building may be used for commercial purposes. Checked at City of Hondo Ordinance 1205-07-19, 2026-10-12.

Is Hondo on the Edwards Aquifer recharge zone?

No, not within the city limits. Queried against the Census Bureau outline of Hondo, the TCEQ zone map returns none of its three regulated zones inside the city, and by this site measurement the recharge zone begins about 4.4 miles north of the closest city edge and about 5.8 miles from the city interior point. The city still draws its own water from deep Edwards Aquifer wells, and a parcel farther out can sit on a regulated zone, where TCEQ wants an approved protection plan before construction starts. Checked at the TCEQ map service for Edwards Aquifer zones and the City of Hondo 2025 drinking water report, 2026-10-12.

What soil sits under Hondo, and what does it mean for a slab?

Mostly Knippa clay, a soil that shrinks and swells. Overlaying the NRCS Medina County soil survey on the Census Bureau city limits, this site finds about 62 percent of Hondo on Knippa clay, which NRCS rates very limited for small commercial buildings, and about 77 percent of all the ground mapped inside the limits shares that rating. Another 12 percent or so is Divot clay loam mapped as flooded. Hondo already requires a sealed engineered foundation plan built on a geotechnical survey or soil test, so budget for that report early. Checked at the NRCS Medina County soil survey (version of September 3, 2026), 2026-10-12.

Price request, no charge

Price a building on a lot in or around Hondo

Six boxes: who you are, how to reach you, the county, the building and the timing.

Your request reaches one independent contractor, and which jobs to accept is that contractor's call. You never pay Compass Camper LLC anything.

By submitting this form, I agree that Alamo Metal Buildings and a metal building construction contractor may contact me at the phone number and email address I provided, including by automated phone calls and prerecorded messages, regarding metal building construction services. Consent is not a condition of any purchase. Message and data rates may apply. I may opt out at any time by asking to be removed during any call or by replying to any email. See our Privacy Policy.

One independent contractor gets your request and chooses which jobs to take on; it does not go to a national lead list.

Prefer the phone? Call (830) 251-6374. Calling gets you the same estimate.

A lot in or around Hondo?

One independent contractor gets your request and chooses which jobs to take on; it does not go to a national lead list.

Checked against the sources 2026-10-12.