Alamo Metal Buildings

Metal building contractors in Guadalupe County, Texas

Guadalupe County requires a permit before anyone constructs or substantially improves a commercial establishment, public building or multi-family dwelling outside the cities, and the County Fire Marshal issues it. The rule is new: Commissioners Court adopted the order on January 27, 2026, in force from February 1, 2026, and it does not apply to an agricultural building used specifically to produce or process food products, shelter livestock, or shelter tools and equipment essential to a farm or ranch operation (Guadalupe County Commissioners Court order, checked 2026-09-13).

More on this

Use decides that clause, not acreage.

Sheet
County
Jurisdiction
Guadalupe County, TX
Checked
2026-09-13
Sources
27 primary documents

Lot picked out? Each request goes to one independent contractor, whose call it is which jobs to accept.

Metal building among pecan trees on green bottomland in Guadalupe County, Texas

Which office signs off on a metal building in Guadalupe County, TX?

The Guadalupe County Fire Marshal Office, 830-303-8856, in the unincorporated county. The order adopts the 2024 International Fire Code with Appendices A through N, effective February 1, 2026, and defines a multi-family dwelling as four or more units and substantial improvement as work costing more than 50 percent of the building value or touching 30 percent or more of the original square footage (county order, checked 2026-09-13).

Those three types are the whole reach of the order. Texas gives a county no general commercial building code, and a fire code is the one county power that reaches a commercial building, open only where the county population tops 250,000 or the county borders one that big. County against city: the San Antonio and Bexar County permit sheet.

Whole chapter checked; it gives counties no such power. Checked at Texas Legislature Online, Local Government Code Chapter 233, county regulation of housing and other structures, 2026-09-13.

Does the fire code exempt an agricultural building in Guadalupe County?

It exempts the ones it names, and the wording is narrow. The order does not apply to an agricultural building used specifically to produce or process food products, shelter livestock, or shelter tools and equipment essential to a farm or ranch operation, and it does not apply to an industrial facility with a fire brigade conforming to Occupational Safety and Health Administration requirements (county order, checked 2026-09-13). Use is what the clause turns on, not acreage.

It also stops at the fire code. The septic, floodplain and driveway permits run through other offices and none of them reads that clause, and a clear span over 24 feet puts the roof supporting members under the state engineering chapter either way.

Checked at Texas Legislature Online, Occupations Code Chapter 1001, engineers and engineering, 2026-09-13.

What does the permit cost, and how long does it take?

Thirty calendar days is the outside limit and the clock has teeth: no decision within 30 days of a complete application and the fees, and the project is approved for the purposes of the order. Four drawings go with it, filed at the Development Center, 310 IH-10 West in Seguin: a floor plan showing exits, an elevation plan, an electrical plan showing the panel, and a site plan showing every structure and the nearest fire hydrant. At $50,000 of estimated construction cost the state step comes first, because a permitting official may not accept the application without verifying TDLR registration: the TDLR sheet.

The county values a project at $75.00 per square foot where construction cost is in question, a project valued under $6,250.00 pays a flat $200.00 plus a technology fee, and a separate building permit is required for each structure. From the fee schedule effective February 1, 2026 (Guadalupe County Appendix A fee schedule, checked 2026-09-13):

  • Plans review, a $100.00 minimum.

  • The building permit and inspection, covering a minimum of three construction site visits.

  • Final inspection with certificate of compliance, $125.00.

  • Site preparation and foundation, a $500.00 permit of its own.

  • A permit renewal for a further 180 days, $200.00, where work has not started in the first 180.

Checked at Texas Legislature Online, Government Code Chapter 469, elimination of architectural barriers, 2026-09-13.

Checked at Texas Department of Licensing and Regulation, Architectural Barriers frequently asked questions, 2026-09-13.

The ground under a slab in Guadalupe County

Close to half of it is deep clay. Houston Black-Heiden on uplands is about 22 percent of the county with shrink-swell rated very high, and Branyon-Barbarosa-Lewisville, deep clayey soils on broad ancient stream terraces, is another 23 percent (USDA Soil Survey of Guadalupe County, Texas, 1977, checked 2026-09-13).

The rest is not clay. Crockett-Demona-Windthorst is the largest association at about 33 percent, loamy to sandy upland known locally as mesquite land, and about 13 percent is Patilo-Arenosa, the deep sands called the sandhills. Rock shows up in the west, where the Austin Chalk is exposed on the upthrown sides of faults in contact with the Taylor Marl (Texas Water Development Board Report 19, checked 2026-09-13). Two tracts a few miles apart can need two different foundations: the slab and foundation sheet.

Where the water drains, and whether this is Edwards Aquifer ground

Not on the TCEQ program county list. The Edwards and associated limestones sit under Guadalupe County only in the subsurface (Texas Water Development Board Report 19, checked 2026-09-13). In the San Antonio region the TCEQ Edwards Aquifer program names Bexar, Medina, Comal, Uvalde and Kinney, and Guadalupe is not among them (Texas Commission on Environmental Quality, Edwards Aquifer Protection Program, checked 2026-09-13). Balcones faults cut the northwest, Luling-Mexia faults the east and south.

A floodplain development permit from the Environmental Health floodplain manager, 830-303-8858, comes before new construction, an addition or any activity inside the regulated floodplain, and the county counts grading, filling, paving, excavation and drilling as development. It is $300 and construction has to start within 180 days. One acre of disturbance adds TCEQ construction general permit coverage, and five acres makes it large construction with a $225 electronic Notice of Intent.

Checked at Texas Commission on Environmental Quality, Edwards Aquifer Protection Program, 2026-09-13.

Checked at Texas Commission on Environmental Quality, construction stormwater general permit TXR150000, 2026-09-13.

Checked at Texas Commission on Environmental Quality, general permit TXR150000, fees, 2026-09-13.

Septic, power and the drive in

Septic has no acreage escape here. The county requires an on-site sewage facility permit whatever the lot size or acreage, and a License to Operate is held before a system is built, altered, extended or operated. Environmental Health charges $600 for a commercial, multi-unit or rental community system, and building without the permit is fined double the permit fee. The county authorized agent covers everywhere except the City of Marion, while Seguin, New Braunfels and San Marcos hold their own jurisdiction.

Power starts early: Guadalupe Valley Electric Cooperative asks three to five weeks from request to connection and charges builders a $6,000 engineering deposit applied toward the final invoice (the septic, water and power sheet has the order of those calls). Road and Bridge, 830-379-9721, charges $100 for a private or temporary driveway simple crossing and $500 for a commercial driveway, doubled where work starts first, and a new access onto a state highway is TxDOT Form 1058 at the San Antonio District, 210-615-1110.

Checked at Texas Commission on Environmental Quality, getting a permit for an on-site sewage facility, 2026-09-13.

Checked at Texas Commission on Environmental Quality, On-Site Activity Reporting System, authorized agent search by county, records read for Bexar, Medina, Wilson, Atascosa, Guadalupe, Karnes and Frio, 2026-09-13.

Checked at Guadalupe Valley Electric Cooperative, developer and builder resources, 2026-09-13.

Checked at Texas Department of Transportation, access management manual, driveway permits, 2026-09-13.

Checked at Texas Department of Transportation, San Antonio District, 2026-09-13.

What is different inside Seguin, Schertz, Cibolo and Marion?

City limits hand the permit to the city, and these four towns do it four ways (city pages, checked 2026-09-13, linked under the permit stack below).

  • Seguin takes the application to the Building Official, runs the 2021 International Building Code and the 2018 International Fire Code, prices permits by square footage under Texas House Bill 852 without publishing the amounts, and registers contractors first, 830-401-2435. The corridor rule on metal walls, the plat rule and the ground inside the city are on the Seguin metal building sheet.

  • Schertz reviews plans in the city and its extraterritorial jurisdiction, quotes 30 days for an initial commercial review and 14 days for each one after, and permits an accessory building of 120 square feet or larger, 210-619-1750. The wall offset rule for commercial steel, the height cap on backyard buildings and the three-county split of the city are on the Schertz metal building sheet.

  • Cibolo wants a pre-application conference before a commercial submittal, runs site plan review for a minimum of 45 business days, and asks for a TDLR registration number over $50,000.00, 210-658-4175. The backyard height caps, the street-front roof rule and the Branyon clay under the city are on the Cibolo metal building sheet.

  • Marion uses a third-party inspector and names no code edition, 830-914-2391.

Hiring metal building contractors in Guadalupe County, TX

Ask who files the four drawings with the County Fire Marshal inside the 30-day clock, because a complete application and the fees start it and no decision in that window approves the project for the purposes of the order (Guadalupe County Commissioners Court order, checked 2026-09-13). Then ask who seals the foundation plan for a tract that may be very high shrink-swell clay or deep sand.

Each request lands with one independent metal building contractor, who picks which jobs to take on and prices those, and Texas issues no builder license behind that title, which the San Antonio and Bexar County permit sheet states once for the whole footprint. Neighbors differ: Bexar County permits through Public Works and its Fire Marshal, Wilson County through a development permit. The build order is in the start-to-finish San Antonio guide; the types here are commercial steel buildings and metal shop buildings.

Checked at Sunset Advisory Commission, Texas Residential Construction Commission; TDLR regulated industries list, 2026-09-13.

Guadalupe County, TX permits, row by row

Each permit and rule the county's own site posts for work outside city limits: who to call, the number, where it was checked and when.

Building permit outside city limits

On the county site

Guadalupe County requires a permit before anyone constructs or substantially improves a commercial establishment, public building or multi-family dwelling in the unincorporated area. The permit is issued under the county fire code order, adopted by Commissioners Court on January 27, 2026 under Chapter 233 of the Texas Local Government Code and effective February 1, 2026, and it is administered by the County Fire Marshal. The order defines a multi-family dwelling as any residential structure of four or more residential dwelling units, and defines substantial improvement as work whose cost exceeds 50 percent of the building value or that involves 30 percent or more of the total square footage of the original building.

Guadalupe County Fire Marshal Office, 830-303-8856.

Checked at Guadalupe County Commissioners Court, Order Adopting a Fire Code and Regulations for Its Enforcement, January 27, 2026, 2026-09-13.

Adopted county fire code and its exemptions

On the county site

The Guadalupe County order adopts the 2024 edition of the International Fire Code with Appendices A through N for the unincorporated county, effective February 1, 2026, and adopts the current NFPA Life Safety Code 101 where the International Building or Fire Codes do not address an issue. The order does not apply to an agricultural building used specifically to produce or process food products, shelter livestock, or shelter tools and equipment essential to a farm or ranch operation, and it does not apply to an industrial facility with a fire brigade conforming to Occupational Safety and Health Administration requirements.

Guadalupe County Fire Marshal Office, 830-303-8856.

Checked at Guadalupe County Commissioners Court, Order Adopting a Fire Code and Regulations for Its Enforcement, January 27, 2026, 2026-09-13.

Decision and inspection deadlines

On the county site

The County Fire Marshal has 30 calendar days from receiving a complete application and the applicable fees to issue or deny a Guadalupe County permit, and where no decision is made in that window the project is approved for the purposes of the order. After a written final inspection request, the fire code official begins the inspection within five business days.

Guadalupe County Fire Marshal Office, 830-303-8856.

Checked at Guadalupe County Commissioners Court, Order Adopting a Fire Code and Regulations for Its Enforcement, January 27, 2026, 2026-09-13.

How the county permit is applied for

On the county site

Guadalupe County permit applications are handled by the Fire Marshal Permitting Department at the Guadalupe County Development Center, 310 IH-10 West, Seguin, and filed through the county online portal. The Building category covers new building construction, structural changes, layout changes, additions, finish out, temporary portable buildings, construction trailers and cell phone towers, and a separate Change of Occupancy application covers any business occupying a building in the unincorporated county. Four documents are required with the application: a floor plan showing exits, an elevation plan showing building heights, an electrical plan showing the panel location, and a site plan showing all structures on the property and the nearest fire hydrant. Review averages three to 10 business days, the office reserves the right to take up to 30 days, and the permit is issued typically within one to three business days after payment.

Guadalupe County Fire Marshal Permitting Department, 830-303-8856.

Checked at Guadalupe County Fire Marshal Office, Permit Application Instructions, 2026-09-13.

Published county building permit fees

On the county site

The Guadalupe County Fire Marshal fee schedule, effective February 1, 2026, builds a commercial building permit fee from three parts: plan review and administrative, building permit and inspection, and final inspection plus certificate of compliance. The base fee for plans review is $100.00 minimum and the final inspection and certificate of compliance fee is $125.00. The county uses $75.00 per square foot to calculate the project valuation where construction cost is in question, and a project valued under $6,250.00 pays a flat $200.00 plus a technology fee. A separate building permit is required for each structure or building, the building permit fee covers a minimum of three construction site visits or inspections, a site preparation and foundation permit is $500.00, a modular or mobile structure installation permit is $750.00, a temporary structure permit is $100.00 under 750 square feet, a permit expires in 180 days where work has not commenced, and a permit renewal for an additional 180-day period is $200.00.

Guadalupe County Fire Marshal Office, 830-303-8856.

Checked at Guadalupe County Fire Marshal Office, Appendix A Fee Schedule, effective February 1, 2026, 2026-09-13.

On-site sewage facility permit

On the county site

Guadalupe County requires an on-site sewage facility permit for every such facility, whatever the lot size or acreage. Before an on-site sewage facility is built, altered, extended or operated, a person must hold a License to Operate from the Guadalupe County Environmental Health Department or from the Texas Commission on Environmental Quality. The department sits at the county Development Center, 310 IH 10 West, Seguin.

Guadalupe County Environmental Health Department, 830-303-8858.

Checked at Guadalupe County, On Site Sewage Facilities, 2026-09-13.

Floodplain development permit

On the county site

A floodplain development permit from the Guadalupe County Environmental Health floodplain manager is required before new construction, remodeling, an addition or any activity on property inside the regulated floodplain. The county describes a five-step process ending in a certificate of compliance, and the start of construction must happen within 180 days. The county defines development broadly for floodplain purposes, covering buildings and other structures, mining, dredging, filling, grading, paving, excavation, drilling and storage of equipment or materials.

Guadalupe County Environmental Health Department, 830-303-8858.

Checked at Guadalupe County Environmental Health, Floodplain Development Permit Process, 2026-09-13.

Published septic and floodplain fees

On the county site

The Guadalupe County Environmental Health fee schedule sets an on-site sewage facility application at $400 for a residential conventional system, $500 for residential advanced treatment, and $600 for a multi-unit, rental community, condominium or commercial system. Repair, connection, alteration, expansion and re-inspection applications are $200 each. A floodplain development application is $300. Construction without an issued Environmental Health permit carries a fine of double the permit fee.

Guadalupe County Environmental Health Department, 830-303-8858.

Checked at Guadalupe County Environmental Health Fee Schedule, approved March 2025 and revised October 23, 2025, 2026-09-13.

Driveway and right-of-way permit

On the county site

Guadalupe County Road and Bridge charges $100 for a work in right-of-way permit for a private or temporary driveway simple crossing and $500 for a commercial driveway permit, with excavation permits from $1,200 to $2,800 depending on the work. Fees are double the original fee for any development or construction commenced before obtaining approval. The fee schedule is effective March 12, 2025, and the department sits at 310 IH 10 West, Seguin.

Guadalupe County Road and Bridge Department, 830-379-9721.

Checked at Guadalupe County, Road and Bridge and Other Fee Schedule, effective March 12, 2025, 2026-09-13.

Which county office reviews what

On the county site

The Guadalupe County Engineer page lists the permit and review types the county handles from 310 IH 10 West, Seguin: engineering plan reviews, driveway permits, excavation permits, floodplain permits, on-site sewage facility permits, and subdivision and plat applications.

Guadalupe County Engineer, 830-303-8858.

Checked at Guadalupe County, County Engineer, 2026-09-13.

Each row comes off Guadalupe County's own site, on the date printed beside it. None is copied from a neighboring county. A blank on the county site means the county posts nothing on that item; it does not mean a building goes up unregulated. The state $50,000 registration and the acre-based stormwater rules hold no matter what the county posts, and so do the 10 rules above that Guadalupe County does post, each on the terms in its own row. Cities inside the county permit for themselves, so an address inside a city limit gets confirmed at that city hall; the only cities described here are the ones whose own pages were checked.

Guadalupe's answer is a fire code order effective February 1, 2026, and Frio County publishes no building permit of any kind. The seven rows, each with the office and the phone that takes the permit, are on the seven-county permit office list.

City permit pages checked in Guadalupe County

  • Seguin , Planning and Codes, Permits Department , 830-401-2435 . Checked at the Seguin permit page, 2026-09-13.
  • Schertz , Inspections Division , 210-619-1750 . Checked at the Schertz permit page, 2026-09-13.
  • Cibolo , Building Permits and Inspections , 210-658-4175 . Checked at the Cibolo permit page, 2026-09-13.
  • Marion , Marion City Hall , 830-914-2391 . Checked at the Marion permit page, 2026-09-13.

Soil and water records checked for Guadalupe County

What owners ask

Is a permit required for a metal building in Guadalupe County, TX?

Outside the city limits, Guadalupe County requires its permit for three kinds of building: public buildings, commercial establishments, and multi-family dwellings with at least four units. Commissioners Court adopted the fire code order on January 27, 2026 under Chapter 233 of the Texas Local Government Code, effective February 1, 2026, and the County Fire Marshal Office, 830-303-8856, administers it from 310 IH-10 West in Seguin. Inside Seguin, Schertz, Cibolo or Marion, that city permits instead. Checked at the county order, 2026-09-13.

Does the Guadalupe County fire code apply to an agricultural building?

Not to the buildings the order names. The Guadalupe County order adopting the 2024 International Fire Code, effective February 1, 2026, does not apply to an agricultural building used specifically to produce or process food products, shelter livestock, or shelter tools and equipment essential to a farm or ranch operation, and it does not apply to an industrial facility with a fire brigade conforming to Occupational Safety and Health Administration requirements. The exemption covers the fire code only: the county septic, floodplain and driveway permits still apply. Checked at the Guadalupe County Commissioners Court order, 2026-09-13.

What does a Guadalupe County building permit cost?

The Guadalupe County Fire Marshal fee schedule effective February 1, 2026 sets plans review at a $100.00 minimum and final inspection with certificate of compliance at $125.00, values a project at $75.00 per square foot where construction cost is in question, and charges a flat $200.00 plus a technology fee under $6,250.00. Site preparation and foundation is a $500.00 permit, and each structure needs its own building permit. Checked at the county Appendix A fee schedule, 2026-09-13.

How long does a Guadalupe County permit take, and what goes with the application?

The County Fire Marshal has 30 calendar days from receiving a complete application and the applicable fees to issue or deny, and where no decision is made in that window the project is approved for the purposes of the county order. The Fire Marshal Permitting Department states that review averages three to 10 business days, reserves the right to take up to 30 days, and issues the permit typically within one to three business days after payment. Four documents go with the application: a floor plan showing exits, an elevation plan showing building heights, an electrical plan showing the panel location, and a site plan showing all structures on the property and the nearest fire hydrant. It is filed through the county online portal or at the Development Center, 310 IH-10 West, Seguin, 830-303-8856. Checked at the Guadalupe County Commissioners Court order and the Fire Marshal permit application instructions, 2026-09-13.

Price request, no charge

Price a building on your lot

Six boxes: who you are, how to reach you, the county, the building and the timing.

Your request reaches one independent contractor, and which jobs to accept is that contractor's call. You never pay Compass Camper LLC anything.

By submitting this form, I agree that Alamo Metal Buildings and a metal building construction contractor may contact me at the phone number and email address I provided, including by automated phone calls and prerecorded messages, regarding metal building construction services. Consent is not a condition of any purchase. Message and data rates may apply. I may opt out at any time by asking to be removed during any call or by replying to any email. See our Privacy Policy.

One independent contractor gets your request and chooses which jobs to take on; it does not go to a national lead list.

Prefer the phone? Call (830) 251-6374. Calling gets you the same estimate.

A lot in Guadalupe County, TX?

One independent contractor gets your request and chooses which jobs to take on; it does not go to a national lead list.

Checked against the sources 2026-09-13.

(830) 251-6374 Request a building price