Alamo Metal Buildings

Covered courts and indoor pickleball buildings in San Antonio, Texas

A covered court is a playing surface under a steel frame and roof, with the sides left open. An indoor pickleball building is that frame closed in, lit, heated and cooled, so play goes on in August and through a norther.

More on this

The slab is the court, not just a floor. One independent metal building contractor prices the court and puts up the building.

Sheet
Service
Jurisdiction
Seven counties, TX
Checked
2026-09-13
Sources
22 primary documents

Lot picked out? Each request goes to one independent contractor, whose call it is which jobs to accept.

Steel canopy covering an open concrete court beside trees in the San Antonio area, Texas

Open-sided cover or a closed, conditioned court?

Decide this first; it changes the frame, the floor, the utilities and the review. A covered court is columns, a roof and open sides. It keeps sun, hail and rain off the surface for the least money per square foot, and lets the wind and the July heat in. A conditioned court closes and insulates the walls, lights and cools the space, and turns the same footprint into a building people stay in.

Conditioning brings in the energy code. The State Energy Conservation Office names the 2015 International Energy Conservation Code as the adopted Texas energy code for commercial construction, in force November 1, 2016. Outside a city, Health and Safety Code 388.004 accepts certification by an accredited program or by private code-certified inspectors, and failing both, the builder certifies on a form.

Court count sets the footprint, and the footprint is what gets ordered: pin down how many courts and how much run-off around them before anyone prices steel.

The same courts under the two kinds of building.
What changesOpen-sided coverClosed, conditioned building
ShellColumns, a roof, open sides.Walls closed in and insulated, doors on the order.
What stays outSun, hail and rain; wind and July heat get in.Weather, wind and heat, at the price of lighting and cooling the whole volume.
Energy codeNothing is heated or cooled, so the question belongs to the other column.The 2015 International Energy Conservation Code, the adopted Texas energy code for commercial construction, in force November 1, 2016.
Who certifies it outside a citySame answer as the other column, once anything is conditioned.Under Health and Safety Code 388.004: an accredited program or private code-certified inspectors, or else the builder, on a form.

Checked at Texas Comptroller of Public Accounts, State Energy Conservation Office, commercial construction energy code, 2026-09-13.

Checked at Texas Legislature Online, Health and Safety Code Chapter 388, building energy efficiency performance standards, 2026-09-13.

The slab doubles as the playing surface

It has two jobs, and the second is unusual. The frame puts its reactions into the column bases, so the foundation is poured to the anchor bolt plan in the package. Then the same concrete has to hold a flat, level plane across the playing area, because a ball finds every dip a forklift would roll right over.

Control joints are where owners get caught. Concrete gets jointed so it cracks where someone chose, and a joint through the playing area is a seam the ball crosses at speed. The concrete is not the finished court either: an acrylic or cushioned surfacing system goes on top, with its own rules on cure time, slab moisture and texture. Settle both with the court layout on the table, before the pour.

The ground decides what flat costs. The Guadalupe County survey rates its Houston Black-Heiden uplands, about 22 percent of the county, very high for shrink-swell (Soil Survey of Guadalupe County, Texas, USDA Soil Conservation Service, 1977, checked 2026-09-13), while northern Bexar and Medina are shallow soil over hard limestone.

Checked at USDA Soil Conservation Service, Soil Survey of Guadalupe County, Texas (1977), 2026-09-13.

Checked at USDA Soil Conservation Service, Soil Survey of Bexar County, Texas (1966), 2026-09-13.

Order clear height and lighting with the frame

No Texas rule this site can point to sets a court height, so treat it as a design input, not a code figure. What counts is the clear height to the underside of the lowest thing over the court: light fixtures, frame bracing, duct runs, door tracks. The sport's rule book and the lighting layout set it, and eave height is cheap at order time and a second building later.

The lights hang from the frame, so their weight and mounting points go on the building order, and players look up, so aiming and shielding matter more than in a shop. That load also decides how power arrives: CPS Energy treats a customer under 300 KVA of diversified load as small commercial on overhead transformers, and 300 KVA and up as large commercial on a pad-mounted transformer, with about 15 business days posted to set it.

Checked at CPS Energy, new commercial construction, 2026-09-13.

Whose stamp, and which reviewer?

An engineer's, on the span alone. The Occupations Code 1001.056 exemption from the state engineering chapter is narrow, and only holds when nobody offers engineering services to the public: one story, 5,000 square feet or less, no clear span wider than 24 feet across the narrow side. One court and its surround pass 24 feet before a second court is drawn. Inside the City of San Antonio every structural sheet, foundation and structural framing, needs a Texas professional engineer's stamp.

Your address picks the reviewer. In San Antonio, square footage buys no shortcut once people gather to watch: assembly occupancies are complex plans at any size, 18 calendar days for the first technical review against eight business days on the minor-plan track. Outside a city it changes at the county line: the county index.

Checked at Texas Legislature Online, Occupations Code Chapter 1001, engineers and engineering, 2026-09-13.

Checked at City of San Antonio Development Services, commercial project application guide, 2026-09-13.

A court the public plays on, and the $50,000 line

It changes the order of the job, which costs more than the fee does. Under Administrative Rule 68.50, a project that reaches $50,000 in total estimated construction cost must be registered with TDLR, and the full construction set goes to a registered accessibility specialist. Coverage turns on Government Code 469.003, which reaches a building that meets the federal Americans with Disabilities Act definition of a public accommodation or a commercial facility. A club selling court time fits that.

The sequence is what stalls a job. Government Code 469.102 keeps the owner from applying for a local building permit, or starting work, until the plans have gone to TDLR, and keeps a local official from taking the application without checking the registration. The filing fee is $175, and the specialist charges a separate fee TDLR posts no amount for.

The $50,000 figure leaves out the land, design fees and furnishings, so ask about nets and loose seating. San Antonio does not run this review and sends a job valued over $50,000 to TDLR: the TDLR sheet for jobs over $50,000.

Checked at Texas Department of Licensing and Regulation, Architectural Barriers frequently asked questions, 2026-09-13.

Checked at Texas Legislature Online, Government Code Chapter 469, elimination of architectural barriers, 2026-09-13.

Checked at Texas Department of Licensing and Regulation, Architectural Barriers fee schedule, 2026-09-13.

Checked at Texas Department of Licensing and Regulation, Architectural Barriers special project registration application, 2026-09-13.

Checked at City of San Antonio Development Services, commercial project application guide, 2026-09-13.

A covered court at your own house

It is treated differently while it stays private. TDLR aims the architectural barriers law and the Texas Accessibility Standards at public and commercial buildings, not private residences, and the 2012 standards reach only the part of a home used to run a business, so selling court time crosses that line. Over the aquifer a home court runs into a different number: TCEQ counts rooftops, driveways, concrete pads and sidewalks as impervious cover, and one case where a homeowner may not need an individual protection plan is keeping that cover at or under 20 percent of the lot.

Checked at Texas Department of Licensing and Regulation, elimination of architectural barriers at a glance, 2026-09-13.

Checked at Texas Department of Licensing and Regulation, 2012 Texas Accessibility Standards, scoping requirements, 2026-09-13.

Checked at Texas Commission on Environmental Quality, Edwards Aquifer private residences, 2026-09-13.

Parking, the aquifer plan and restrooms

A club is as much a parking lot as a building. Three filings ride on that dirt:

  • Stormwater. Disturbing an acre or more, with runoff to surface water in the state, takes coverage under the TCEQ construction general permit and a pollution prevention plan up front. One acre to under five posts a signed site notice two days ahead; five acres and up files a Notice of Intent through STEERS, $225 online or $325 on paper.

  • The aquifer, in Bexar and Medina. On the recharge, transition or contributing zone, construction cannot start until TCEQ approves an Edwards Aquifer protection plan, and on the recharge zone it covers buildings, roads, clearing and digging, so it reaches the pad and the parking. Administrative review can run 30 days and technical review 90.

  • Septic. Restrooms on a lot with no sewer make it a commercial permit: the rules count any building that is not a single-family home or a duplex as commercial, and 30 TAC 285.5 requires an engineer or sanitarian to seal the planning materials on the recharge zone.

Checked at Texas Commission on Environmental Quality, construction stormwater general permit TXR150000, 2026-09-13.

Checked at Texas Commission on Environmental Quality, general permit TXR150000, fees, 2026-09-13.

Checked at Texas Commission on Environmental Quality, Edwards Aquifer Protection Program, 2026-09-13.

Checked at Texas Commission on Environmental Quality, Edwards Aquifer Protection Program, what plans you might need, 2026-09-13.

Checked at Texas Commission on Environmental Quality, Edwards Aquifer application and review process, 2026-09-13.

Checked at Texas Commission on Environmental Quality publication RG-472, on-site sewage facility rules compilation, 2026-09-13.

Who needs a court building, and what the estimate should say

It suits an owner whose play stops when the weather turns: a club selling court time, a school or congregation adding a gym-sized room, a family with the acreage for one. If you want assembly space with a stage and a kitchen instead of a marked court, see churches and community halls. If an open roof is all you need, price it against post-frame and pole barn buildings: posts in the ground carry a simple roof for less than red iron.

The surfacing system is what makes this a court and not a shed, and it puts conditions on the concrete before anyone can price the job: cure time, slab moisture, texture, and where joints fall around the playing area. Put those in the request, and it reaches one independent metal building contractor, whose call it is which jobs to accept. Texas licenses no home builder or general contractor, so the license numbers worth asking for belong to the electrician and the plumber.

Get on paper: court count and run-off; clear height under the lights; where the joints fall; whether surfacing is in scope; and who files the TDLR registration, the permit, the stormwater notice and the aquifer plan. No company here posts a price, and court count, run-off and surfacing conditions all move the number, so it gets priced to your layout. Job order: the start-to-finish San Antonio guide.

Checked at Sunset Advisory Commission, Texas Residential Construction Commission; TDLR regulated industries list, 2026-09-13.

Company price pages checked; none shows a figure. Checked at Four San Antonio-area metal building company websites, 2026-09-13.

What owners ask

Is TDLR registration needed for a $50,000 indoor pickleball building in Texas?

Yes, once the total estimated construction cost reaches $50,000. Under Administrative Rule 68.50, the project must be registered with TDLR (Texas Department of Licensing and Regulation), the full construction set goes to a registered accessibility specialist, and a $175 filing fee is paid. Coverage turns on Government Code 469.003, which reaches a building that meets the federal Americans with Disabilities Act definition of a public accommodation or of a commercial facility, so a court rented by the hour is the case to check. Checked at tdlr.texas.gov and Texas Legislature Online, 2026-09-13.

Do the Texas Accessibility Standards reach a covered court at a private home?

No, while it stays private. TDLR says the accessibility law and the Texas Accessibility Standards are written for public and commercial buildings and facilities, and stay out of private residences. The 2012 Texas Accessibility Standards draw the limit: when a commercial facility or public accommodation sits inside a private residence, the part used only as a home is outside the standards and the part used to run the business is inside them. Checked at tdlr.texas.gov, 2026-09-13.

In Bexar County, TX, who permits a covered court outside city limits?

The Bexar County Fire Marshal Office at 210-335-0300. In unincorporated Bexar County that office decides when structures or areas not for single-family dwelling use need building permits, and the permit reaches site clearing as well as the build. The county gets 30 days to issue or deny; the permit then runs 180 days from issue. Checked at bexar.org, 2026-09-13.

Is an architect needed on a Texas pickleball court building?

Often not, for a privately owned one, but a big footprint crosses the line. Under Occupations Code 1051.606, someone who does not present themselves as an architect may draw plans for a commercial building in private hands no taller than two stories and no larger than 20,000 square feet, and a multi-court building with a lobby and restrooms can pass that. Engineering is harder to avoid: Occupations Code 1001.056 exempts only a building of one story, 5,000 square feet or less, with no clear span over 24 feet. Checked at Texas Legislature Online, 2026-09-13.

Price request, no charge

Price a building on your lot

Six boxes: who you are, how to reach you, the county, the building and the timing.

Your request reaches one independent contractor, and which jobs to accept is that contractor's call. You never pay Compass Camper LLC anything.

By submitting this form, I agree that Alamo Metal Buildings and a metal building construction contractor may contact me at the phone number and email address I provided, including by automated phone calls and prerecorded messages, regarding metal building construction services. Consent is not a condition of any purchase. Message and data rates may apply. I may opt out at any time by asking to be removed during any call or by replying to any email. See our Privacy Policy.

One independent contractor gets your request and chooses which jobs to take on; it does not go to a national lead list.

Prefer the phone? Call (830) 251-6374. Calling gets you the same estimate.

Want a number on covered courts and pickleball halls?

One independent contractor gets your request and chooses which jobs to take on; it does not go to a national lead list.

Checked against the sources 2026-09-13.

(830) 251-6374 Request a building price